035 GIE Kindergarten Renovation Basel, Switzerland


Incomplete Open Cube

The main task was to convert a half underground level into a new nursing area with communal functions. We propose the maximum spatial renovation with the minimum architectural elements. A existing ennobled stair generates the new open space and gathering area leading to the different functions.

Location:
Basel, Switzerland
Program:
Kindergarten Refurbishment and Extension ca 150 m2, nursing room, gym, technical rooms, toilet, eating area and communal areas
Year:
2015-2016
Status:
Comission. Built
Collaborators:
ARGE studioPEZ + KGRUPPE, Alex Matía (PEZ)
Date: May 11, 2017